Roof replacement done in a day or two
We take the old roof down to the decking, fix what we find and put the new one on, then pick up every nail before we leave.
Pick the roof
that suits your house
See them at your free inspection
Architectural shingles
Thick, layered shingles with a deep shadow line, in colors that go with brick, stone and siding.
Impact-rated shingles
Shingles built to take a harder hit than standard ones, which suits a city with a spring hail season.
Standing seam metal
Metal panels joined at raised seams, for clean lines on the house, a long life and very little upkeep.
Your new roof, layer by layer
Most roofs take one day, and larger or steeper ones take two. The yard is covered by 7 AM, and by 5 PM we’ve swept for nails and walked the roof with you.
8 AM
Decking
The old roof comes off and we check every board, replacing any that are soft.
10 AM
Ice and water shield
Sealed along the eaves and in the valleys, where water runs and collects.
10:30 AM
Underlayment
A synthetic layer over the rest of the deck, laid in overlapping rows.
11 AM
Drip edge and flashing
Metal along the edges and around the chimney, vents and walls.
Noon
Shingles
Nailed row by row from the eaves up to the ridge, each row lapping over the one below.
3 PM
Ridge vent and caps
A vent along the ridge lets the attic breathe, capped to match the roof.
What sets the price
of your new roof
Every roof gets a written price after the free inspection, with each of these spelled out so you can see where the money goes.
Size of the roof
Measured in squares, and each square covers 100 square feet.
Pitch and height
Steeper and taller roofs take longer and need more safety gear.
Material
Architectural or impact-rated shingles, or standing seam metal.
Layers to remove
A second old layer under the first adds time to the tear-off.
Decking repairs
Soft boards are replaced at a set price per sheet, listed in the estimate.
Vents, skylights and chimneys
Each one is flashed and sealed by hand as the shingles go on.
Pay for it over time
Monthly payment options on approved credit, with your terms in writing.
See financing
Questions people ask
before a new roof goes on
How long does a new roof take?
Most homes take one day. Larger or steeper roofs take two days, and we tell you how long yours will take at the free inspection.
Do I need to be home on the day?
Not while the crew works. Most people are home for the walk-through at the end of the day, when we show them the finished roof.
What if you find rotten decking?
We replace the soft boards at the set price per sheet listed in your estimate, and send you photos of each one we changed.
How do you protect my yard and gutters?
Tarps go over the lawn, flower beds and gutters before the tear-off, and we sweep the yard for nails before we leave.
What does your warranty cover?
Our own 10-year warranty covers the work, on top of the shingle maker’s warranty on the materials.
1 week ago
“The old roof was off by eight and the new one was on before dinner, with the yard cleaner than they found it.”
Teresa W.
Broken Arrow
3 weeks ago
“The price came in writing with nothing added on later, and the crew covered every single flower bed.”
Greg S.
Owasso
1 month ago
“They walked the finished roof with me and pointed out every vent and every bit of new flashing.”
Rosa M.
Jenks
2 months ago
“We picked impact-rated shingles after last spring’s hail, and the crew had the whole roof done in a day.”
Darnell K.
Bixby
2 months ago
“Financing was simple, and we had our terms in writing before anyone set foot on the roof itself.”
Priya N.
Sand Springs